Theoretical clamping force.
The 80T figure describes the theoretical force of the toggle mechanism. Mold, material and process suitability must be confirmed for each application.
A bench-scale, all-electric injection molding machine for prototypes, R&D and low-volume production—without a hydraulic power pack.
Start with a request, not a payment. Your configuration, price and delivery terms are confirmed in a proforma invoice first.
PAYMENT LOGICClamping, plasticizing, injection, cooling and process control—integrated into one all-electric bench-scale system.
The 80T figure describes the theoretical force of the toggle mechanism. Mold, material and process suitability must be confirmed for each application.
Rotary feeding with ejection-style injection. Up to 50g per shot, depending on material and processing conditions.
Four barrel heating zones plus a barrel drying function support controlled material preparation.
An 18L water tank and 360° water-cooling system with dual active heat-dissipation circuits.
STM32 control board, 7-inch touchscreen, material-runout detection and a tri-color status light.
A side-sliding safety door and dedicated exhaust fans for the heating and mold-opening areas. Exhaust routing and facility ventilation must be assessed for the material being processed.
All-electric operation means no hydraulic pump or hydraulic oil. “Quiet” describes the design intent; no dB(A) rating is claimed without a verified acoustic test report.
Share your part drawing, target material, part weight and mold details before ordering. We confirm application fit and FAT criteria in writing; a machine specification alone cannot guarantee your part result.
Final configuration and destination-specific requirements are confirmed before the production deposit.
| Model | DXC-200Pro |
|---|---|
| Machine dimensions | 1930.6 × 446.6 × 959.4 mm (L × W × H) |
| Total power | 1100W · AC110V / AC220V |
| Barrel heating | 4 independently zoned sections |
| Clamping structure | Toggle-link mechanism · theoretical 80T |
| Injection method | Rotary feeding with ejection-style injection |
| Maximum shot volume | Up to 50g per shot; material-dependent |
| Mold cooling | Water-cooled · 18L tank · 360° dual active heat-dissipation circuits |
| Controller | STM32 MCU board · 7-inch touchscreen |
| Monitoring & indication | Material-runout detection · tri-color status light |
| Additional functions | Barrel drying · side-sliding safety door · heating and mold-area exhaust fans |
* 50g is a maximum design figure, not a universal rating for every polymer. Actual shot capability and part results vary with material density, formulation, mold and process. Machine dimensions are not shipping dimensions.
Compliance scope is reviewed for the destination and final configuration before order acceptance. CE, UKCA, UL or any other certification is not implied by this page and must be expressly documented when applicable.
You approve the machine, the commercial terms and the factory acceptance result before the final balance is due.
Create a request for free. This website does not collect card or bank payments.
Due only after you receive, verify and accept the proforma invoice (PI).
Due after FAT approval and balance invoice, before handover to the carrier.
Create your presale request with destination, voltage, quantity, part and material details. A request is not an accepted order and triggers no payment.
Application review and a route to a formal quotation.
The PI states machine price, currency, configuration, FCA or DAP named place, freight scope, estimated production window and long-stop date, payment details, FAT scope, warranty and cancellation terms. Your order exists only after written acceptance and our written confirmation.
Beneficiary, total landed-cost scope, dates and refund terms.
Use only the bank transfer or agreed escrow route stated in the PI. Include the PI reference and keep your remittance receipt. The production clock starts only when the deposit has cleared and the configuration is frozen in writing.
Cleared deposit + written configuration freeze.
Receive production updates, then a remote factory acceptance test (FAT) or the agreed on-site FAT. We record the agreed checklist, results and open items. Do not pay the balance against an unapproved or unresolved FAT.
Written FAT record and resolution of open items.
After FAT approval, you receive the balance invoice with a due date. Pay 70% using the verified PI payment route. The machine is released to the carrier after cleared funds and logistics readiness.
FAT approval + cleared balance + dispatch release.
We provide the agreed dispatch documents and available tracking. Carrier transit and customs time are separate from production time. Import clearance, duties and taxes remain yours under both FCA and DAP unless the PI expressly says otherwise.
Packing, dispatch and tracking information as agreed.
Check the shipment at arrival, document any exceptions and follow the installation and safety instructions. Remote onboarding, fault diagnosis and the limited warranty process continue after delivery.
Onboarding, technical support and warranty route.
The signed or otherwise accepted PI is the controlling commercial document. It replaces website estimates or general terms where it contains a specific, agreed provision.
Choose one trade term and one precise named place in the PI. “Worldwide shipping” alone is not a delivery term.
DAP is not DDP. Import duties and taxes are not included in DAP. Destination feasibility and any restricted locations are confirmed before deposit.
Export packaging, packed dimensions, gross weight and freight charges are confirmed in the PI or referenced quotation. Never plan freight from machine-only dimensions.
Commercial invoice, packing list, transport document and other agreed documents are supplied as applicable. Your customs broker confirms HS classification and local import requirements.
Where possible, inspect packaging and visible machine condition before signing. Record exceptions on the delivery receipt and take an uninterrupted unboxing video.
Notify visible damage or shortage promptly, preferably within 48 hours. Keep all packaging and evidence. Carrier investigation and the agreed remedy follow; never return the machine without a written RMA.
Production lead time starts only after the deposit clears and configuration is frozen. The PI states the estimated ship window and a long-stop date. Carrier transit and customs clearance are not included unless expressly stated. We communicate material delays and a revised plan; the long-stop cancellation right below protects you if we cannot deliver for reasons within our control.
A clear route from first inspection to remote diagnosis, parts and approved repair.
Provide PI number, machine serial number, fault description, settings, photos/video and any alarm information.
For a safety concern, stop and isolate power first. We use guided checks to identify the cause; target acknowledgement is two business days.
Remote guidance, covered replacement part, approved repair or other remedy is confirmed before work or shipment.
Run the agreed verification test, retain service records and close the case only after the remedy is documented.
From documented delivery, unless a different period is expressly stated in your PI. Covers verified defects in materials or workmanship under normal use and approved processing conditions.
You perform safe, guided replacement and any destination import charges for warranty parts unless mandatory law or the PI says otherwise. Expedited freight and on-site service are optional, pre-approved and separately quoted. DXC may repair, replace parts, replace the machine or refund the affected machine where a verified covered defect cannot be reasonably resolved, subject to the PI and applicable law.
The standard rules below apply when incorporated into your PI. Mandatory consumer or local rights, where applicable, are not excluded.
| WHEN | WHAT HAPPENS |
|---|---|
| Before accepting the PI | Cancel freely. No payment is due and no order exists. |
| After deposit, before configuration freeze | You may cancel for a full deposit refund, less only disclosed, non-recoverable bank or escrow charges. No production cancellation penalty applies. |
| After configuration freeze | Cancellation requires review. Documented, non-recoverable production, customization and committed logistics costs may be deducted as stated in the PI and permitted by law. The 30% deposit is not automatically forfeited; any remaining refundable amount is returned. |
| FAT does not meet the agreed criteria | Do not pay the final balance. DXC must correct and repeat the FAT. If a material nonconformity remains unresolved, you may cancel the undelivered machine and receive a full refund of amounts paid for it. |
| DXC cannot supply or misses the PI long-stop date | For reasons within DXC’s control, you may cancel the undelivered machine and receive a full refund of amounts paid for it. Buyer-caused changes, delayed approvals and agreed force-majeure handling remain governed by the PI. |
| After shipment or for change of mind | Returns are not automatic because cross-border freight, customs and configuration costs apply. Defects follow the warranty and RMA route; any discretionary return requires written approval and a stated deduction and freight schedule. |
Approved refunds are returned to the original payer through the original payment route and in the PI currency. Processing is initiated within 10 business days of written approval; bank posting time, correspondent-bank charges and exchange-rate differences outside DXC’s control may affect receipt. No refund is made to an unrelated third-party account.
Still application-specific? Include the details in your request and get the answer written into your technical agreement or PI.
Ask with a presale requestNo. It creates a request summary only. No payment is taken. An order requires PI acceptance and written order confirmation; production requires cleared deposit and configuration freeze.
There is no universal checkout price on this page. Your quotation identifies the machine configuration, quantity, currency, packaging, trade term and freight scope. Review the full PI before paying any deposit.
After you approve the agreed FAT and receive the balance invoice, and before the machine is released to the carrier. The invoice states the exact due date. An unresolved FAT is not a valid reason to rush the balance.
80T is the theoretical clamping force of the toggle-link structure. Application suitability and any verified test values must be documented separately; do not treat the theoretical figure as a guarantee for every mold.
No. Up to 50g is material- and process-dependent. Density, formulation, feeding, temperature and mold conditions affect actual results. Submit the exact material grade and part weight for review.
The all-electric architecture avoids a hydraulic power pack, which removes that noise source and hydraulic oil. It does not establish a measured workplace noise rating. Request an acoustic test report if a numerical limit matters to your facility.
Yes—provide drawings, mold interface details, material grade, part weight and target output. Feasibility, any required trial and FAT acceptance criteria must be agreed in writing. A verbal “should work” is not an acceptance criterion.
No certification is implied by this website. Required electrical, EMC, machinery and market-entry documents are reviewed for the destination and final configuration, then expressly listed in the technical agreement or PI where available.
You do under both FCA and DAP, unless your PI expressly offers a different term. DAP includes main carriage to the named destination, not import duty/tax payment or import clearance by DXC.
Record exceptions on the delivery receipt where possible, photograph the packaging and machine, keep all packaging and notify us promptly—preferably within 48 hours. Do not return anything until you receive a written RMA and shipping instructions.
Remote FAT with an agreed checklist is the standard route. On-site witness testing may be offered where feasible and must be scheduled and costed in the PI. Either route ends with a written record and open-item resolution.
The PI separates the production ship window from carrier transit and customs time. It also states a long-stop date and the related cancellation right. Dates are not calculated from your website request; they start from cleared deposit plus configuration freeze.
Tell us where you are, what you want to mold and how you want it delivered. Get a configuration and PI—not a surprise card charge.
No online payment. No card details. No automatic order. No production start.
No payment was taken and nothing has been transmitted. Download or copy the summary, then send it to your authorized DXC sales contact.
The email draft opens without a recipient so you can choose your verified sales contact. Do not use this summary as payment instructions.